Solar Farm Investment in Romania: EUR Income from EU Energy Markets
Turnkey, grid-ready photovoltaic power plants with full project ownership, measured production data and long-term land lease — professionally developed and delivered ready for operation.
Own a Grid-Ready Solar Power Plant in Romania
Agrolidya offers direct ownership of utility-scale solar projects in Romania's high-irradiation regions. Each project is delivered as a complete package: secured land lease, grid connection agreement, building permits, completed engineering, and turnkey EPC construction.
- Full ownership of the project company (SPV) and all assets
- Grid connection agreements secured with the distribution operator
- Building permits obtained — projects ready for construction
- Electricity sold on the EU-regulated market via OPCOM
- Optional battery storage (BESS) for enhanced revenue capture
Why Invest in Solar Energy in Romania?
Romania combines EU market infrastructure with some of the most competitive project economics in Europe — strong irradiation, low land costs, and a maturing renewable energy framework.
Strong Production
Measured specific production of ~1,390 kWh/kWp/year with performance ratios above 85% — validated by on-site solar measurement, not estimates.
EU Energy Market
Electricity is sold in EUR through OPCOM, the Romanian power market operator, within a transparent, EU-regulated trading framework.
Rising Demand
European electricity demand and renewable targets continue to grow, while Romania's CfD fixed-price framework is under active development.
Low Entry Costs
Land lease from ~€2,000/ha/year and all-in project costs of roughly €676,000 per MWp — significantly below Western European levels.
Production Backed by Measured Data
Every project is engineered on real solar measurement and full PVsyst simulation. Sample figures below are from a 4.9 MWp reference project in Brașov county.
How the Investment Works
Select Your Project
Choose from available grid-ready projects by size and budget. Each comes with complete due-diligence documentation.
Acquire the Project SPV
Full ownership of the project company transfers to you — including permits, grid agreement, land lease, and engineering.
Turnkey Construction
Our EPC team builds and commissions the plant to specification, with fixed pricing and defined timelines.
Generate EUR Income
Electricity is sold via OPCOM on the Romanian power market. Optional O&M packages keep the operation fully hands-off.
A Complete, De-Risked Package
- Long-term land lease (30 years) at fixed annual cost
- Grid connection agreement with the distribution operator (DEER)
- Building permit issued by the local municipality
- Completed engineering, topographic and design works
- Turnkey EPC construction at fixed €/MWp pricing
- Optional BESS (battery storage) integration
- Optional operation & maintenance (O&M) services
Projected Returns — 4.9 MWp Reference Project
Scenarios below are based on measured production of 6.83 GWh/year and a total turnkey investment of €3.32M. Actual results depend on market tariffs and plant performance.
| Scenario | Tariff (€/kWh) | Annual Revenue | Net Annual Income | Payback | Net Yield |
|---|---|---|---|---|---|
| Current Market | 0.080 | €546,700 | €497,000 | ~6.7 years | ~15.0% |
| 2026 Reference Tariff | 0.075 | €512,500 | €463,000 | ~7.2 years | ~14.0% |
| Conservative | 0.065 | €444,200 | €395,000 | ~8.4 years | ~11.9% |
Electricity in Romania is sold on the free market through OPCOM; there is currently no state purchase guarantee. A fixed-price CfD framework is under development by the Romanian state. Figures exclude financing costs and are provided for information only — full financial models are shared during due diligence.
Asset-Backed, Transparent Ownership
Direct SPV Ownership
You own 100% of the Romanian project company holding all permits, contracts and physical assets — registered in your name or corporate entity.
Documented Rights
Grid connection agreements, building permits, and 30-year land leases are formal, registered contracts transferred with the SPV.
Full Due Diligence
Every project includes complete legal, technical and financial documentation — reviewed with your own advisors before commitment.
Available Solar Projects in Romania
Grid-ready projects in different sizes. Each listing includes full technical documentation, measured production data and a complete financial model.
Mid-Scale Project ~2 MWp
Utility-Scale ~10 MWp
Solar Farm Investment in Romania — Frequently Asked Questions
How does a solar farm investment in Romania generate income?
What is the minimum investment amount?
Do I own the solar project directly?
What is the expected payback period?
Do I need to manage the plant myself?
Why Romania rather than other EU countries?
We guide you every step.
Let's connect to better understand your needs and goals.
Our team is here to answer your questions and guide you forward.
UK Office
TR Office
Agrolidya operates in the United Kingdom and Turkiye under the following entities:
Agrolidya Global Holdings Ltd (Company No: 17137171), registered in England and Wales, and Agrolidya Tarim A.S. (Tax No: 0091507594), registered in Turkiye.