Solar Farm Investment in Romania: EUR Income from EU Energy Markets

Turnkey, grid-ready photovoltaic power plants with full project ownership, measured production data and long-term land lease — professionally developed and delivered ready for operation.

Location
Romania (EU)
Income Currency
EUR / kWh
Payback Period
From ~6.7 years
Project Sizes
1 – 10+ MWp
Ownership
100% Project SPV
Plant Lifetime
30+ years
Investment Overview

Own a Grid-Ready Solar Power Plant in Romania

Agrolidya offers direct ownership of utility-scale solar projects in Romania's high-irradiation regions. Each project is delivered as a complete package: secured land lease, grid connection agreement, building permits, completed engineering, and turnkey EPC construction.

  • Full ownership of the project company (SPV) and all assets
  • Grid connection agreements secured with the distribution operator
  • Building permits obtained — projects ready for construction
  • Electricity sold on the EU-regulated market via OPCOM
  • Optional battery storage (BESS) for enhanced revenue capture
Aerial view of a large-scale ground-mounted solar farm
Market Rationale

Why Invest in Solar Energy in Romania?

Romania combines EU market infrastructure with some of the most competitive project economics in Europe — strong irradiation, low land costs, and a maturing renewable energy framework.

Strong Production

Measured specific production of ~1,390 kWh/kWp/year with performance ratios above 85% — validated by on-site solar measurement, not estimates.

EU Energy Market

Electricity is sold in EUR through OPCOM, the Romanian power market operator, within a transparent, EU-regulated trading framework.

Rising Demand

European electricity demand and renewable targets continue to grow, while Romania's CfD fixed-price framework is under active development.

Low Entry Costs

Land lease from ~€2,000/ha/year and all-in project costs of roughly €676,000 per MWp — significantly below Western European levels.

Verified Performance

Production Backed by Measured Data

Every project is engineered on real solar measurement and full PVsyst simulation. Sample figures below are from a 4.9 MWp reference project in Brașov county.

6.83 GWh
Annual energy production
1,393
kWh / kWp / year specific production
85.9%
Performance ratio (PR)
€0.075–0.080
Market tariff per kWh (2026)
Process

How the Investment Works

Select Your Project

Choose from available grid-ready projects by size and budget. Each comes with complete due-diligence documentation.

Acquire the Project SPV

Full ownership of the project company transfers to you — including permits, grid agreement, land lease, and engineering.

Turnkey Construction

Our EPC team builds and commissions the plant to specification, with fixed pricing and defined timelines.

Generate EUR Income

Electricity is sold via OPCOM on the Romanian power market. Optional O&M packages keep the operation fully hands-off.

What's Included

A Complete, De-Risked Package

  • Long-term land lease (30 years) at fixed annual cost
  • Grid connection agreement with the distribution operator (DEER)
  • Building permit issued by the local municipality
  • Completed engineering, topographic and design works
  • Turnkey EPC construction at fixed €/MWp pricing
  • Optional BESS (battery storage) integration
  • Optional operation & maintenance (O&M) services
Landscape masterplan of a grid-ready solar farm project
Financial Model

Projected Returns — 4.9 MWp Reference Project

Scenarios below are based on measured production of 6.83 GWh/year and a total turnkey investment of €3.32M. Actual results depend on market tariffs and plant performance.

Scenario Tariff (€/kWh) Annual Revenue Net Annual Income Payback Net Yield
Current Market0.080€546,700€497,000~6.7 years~15.0%
2026 Reference Tariff0.075€512,500€463,000~7.2 years~14.0%
Conservative0.065€444,200€395,000~8.4 years~11.9%

Electricity in Romania is sold on the free market through OPCOM; there is currently no state purchase guarantee. A fixed-price CfD framework is under development by the Romanian state. Figures exclude financing costs and are provided for information only — full financial models are shared during due diligence.

Ownership & Security

Asset-Backed, Transparent Ownership

Direct SPV Ownership

You own 100% of the Romanian project company holding all permits, contracts and physical assets — registered in your name or corporate entity.

Documented Rights

Grid connection agreements, building permits, and 30-year land leases are formal, registered contracts transferred with the SPV.

Full Due Diligence

Every project includes complete legal, technical and financial documentation — reviewed with your own advisors before commitment.

Portfolio

Available Solar Projects in Romania

Grid-ready projects in different sizes. Each listing includes full technical documentation, measured production data and a complete financial model.

📍 Brașov — Mândra Available

Brașov-Mândra 4.9 MWp

Capacity4,904 kWp / 4,900 kWe
BESS10,000 kWh
Annual Production6.83 GWh
Land5.9 ha · 30-yr lease
StatusPermitted · Grid-ready
Total Investment€3.32M turnkey
Request Teaser & Full Model
📍 Romania Coming Soon

Mid-Scale Project ~2 MWp

Capacity~2,000 kWp
BESSOptional
Annual Production~2.8 GWh
LandLong-term lease
StatusIn development
Indicative Investment~€1.4M
Join the Waiting List
📍 Romania Coming Soon

Utility-Scale ~10 MWp

Capacity~10,000 kWp
BESSPlanned
Annual Production~13.9 GWh
LandLong-term lease
StatusIn development
Indicative Investment~€6.8M
Join the Waiting List
FAQ

Solar Farm Investment in Romania — Frequently Asked Questions

How does a solar farm investment in Romania generate income?
Electricity produced by the plant is sold on the Romanian power market through OPCOM, the national power market operator. Revenue is generated in EUR per kWh produced. Romania's CfD (Contract for Difference) framework for fixed-price purchase guarantees is currently under development by the state.
What is the minimum investment amount?
Projects are offered in different sizes, typically from around 1 MWp upwards. As a reference, a fully turnkey 4.9 MWp project — including EPC construction, grid connection and land lease — is approximately €3.3M, or roughly €676,000 per MWp installed.
Do I own the solar project directly?
Yes. You acquire full ownership of the Romanian project company (SPV) that holds the building permits, grid connection agreement, land lease and all engineering assets. This is a direct, asset-backed ownership structure — not a fund or share scheme.
What is the expected payback period?
Based on current market tariffs of €0.075–0.080 per kWh and measured production data, typical payback is approximately 6.5–8 years. Plants are engineered for 30+ years of operation, providing long-term income well beyond payback.
Do I need to manage the plant myself?
No. Optional operation & maintenance (O&M) packages cover monitoring, cleaning, maintenance and market sales administration, making the investment fully hands-off.
Why Romania rather than other EU countries?
Romania combines high solar irradiation, EU-regulated market infrastructure, competitive land lease costs (~€2,000/ha/year), and strong measured production (~1,390 kWh/kWp/year) — resulting in per-MWp project economics that are difficult to match in Western Europe.

We guide you every step.

Let's connect to better understand your needs and goals.

Our team is here to answer your questions and guide you forward.

UK Office

UK Office

1 White Gates KT70GB Surrey London - United Kingdom
TR Office

TR Office

Selimşahlar, Sürat Yolu Sk No:57, Şehzadeler/Manisa

Agrolidya operates in the United Kingdom and Turkiye under the following entities:
Agrolidya Global Holdings Ltd (Company No: 17137171), registered in England and Wales, and Agrolidya Tarim A.S. (Tax No: 0091507594), registered in Turkiye.

Get in Touch

Please enter your full name!
Please provide a valid email address!
Please provide a valid phone number!
Please write your message!
Chat with us